Goose Island Draft Cart

  • The final cart finished and in the studio just before shipping.

  • Engineer renderings for the Fab Shop to build from.

  • The finished custom base frame ready to build upon.

  • Cutting the wall and floor parts before installing the draft unit.

  • Starting to construct the base.

  • The base is coming together.

  • Refrigerated draft unit installed into the custom base.

  • Custom header being built in the Fab Shop.

  • Custom Seaboard tops cut and ready for the carts.

  • Starting to build upon the custom header frame.

  • Lights installed and being tested in the custom backlit header.

  • Finished unit getting graphics installed.